Showing posts with label bathroom. Show all posts
Showing posts with label bathroom. Show all posts

Friday, August 14, 2009

Construction – Day 1

The Crew:

Rewired kitchen light wiring – need to patch/hang new track lighting
Demo’d 1/2 bath for conversion to full bath
Painted Common Area Hallway (3 Flights)

Our Projects:

Scraped and Repainted the front cement blocks
Fixed Closet Drawers – Guest Room
Painted Guest Room Trim
Finished Repainting the Dinning Room a more “neutral” color

Guest Bathroom:

day1_guestbath1day1_guestbath3day1_guestbath2day1_guestbath4

Tuesday, November 21, 2006

the crappers

both bathrooms had sponge paint all over them. we are not really into sponge paint and it doesn't really seem to go with the urban or the arts and crafts feel of our condo. unfortunately we didn't capture the whole sponge paint look of the bath rooms (you can see little corner sections) but now the bathrooms are pleasing to the eye, well at least the wall colors. again, grand plans for both of these rooms, including making the half bath a full bath and in the master bath separating the shower and tub. but down the road...

The Painters:


The Finished Bathrooms: